← Back to Global Train Finder

Train Schedules & Coach Position

Verified arrival & departure timings, platform guides, rake layout, and official working timetables.

🔍
14713 EXPRESS
Mon Tue Wed Thu Fri Sat Sun
⚡ 55 km/h

SGNR JAT EXP

🇮🇳 Indian Railways (CRIS / NTES)
📅 Published Working Timetable
SL3A2AGN
Origin Departure
14:45
SHRI GANGANAGAR
SGNR Platform TBA Day 1
⏱️ —
534 km · 13 intermediate halts
Final Arrival
02:35
JAMMU TAWI
JAT Platform TBA Day 2
📏
Total Distance
534 km
⏱️
Duration
—
⚡
Average Speed
55 km/h
🚉
Scheduled Halts
15 Stations
Rake Formation & Coach Sequence

Coach Position Guide (21-Unit Formation · 1,265 Total Seats)

Select any carriage along the consist track below to inspect its position, class layout, and seat map.

Engine ×1 SLR ×2 GEN ×3 SL ×6 Pantry ×1 3E ×1 3A ×4 2A ×2 1A ×1
◀ Front / Engine End 21 Connected Cars · Interactive Track View Rear End ▶
#2 · SLR Seating cum Luggage Rake • Luggage / Guard / Divyangjan
30 Seats / Berths
🔎 Search Seat / Berth Position Enter a seat number (or coach + seat, e.g. E1 18 or 24)
Tap any seat or berth to inspect position
Working Timetable

Station Halts & Platform Schedule (15 Scheduled Stops)

Published arrival, departure, halt duration, and assigned platforms per Indian Railways (CRIS / NTES) working documents.

Route # Station Code Arrival (STA) Departure (STD) Halt Platform Day Distance
01
SHRI GANGANAGAR ORIGIN
SGNR 14:45 14:45 — TBA Day 1
0 km
02
ABOHAR
ABS 15:26 15:28 2 min TBA Day 1
53 km
03
MALOUT
MOT 15:52 15:54 2 min TBA Day 1
82 km
04
BHATINDA JN
BTI 16:45 16:55 10 min TBA Day 1
112 km
05
RAMPURA PHUL
PUL 17:24 17:26 2 min TBA Day 1
145 km
06
TAPA
TAPA 17:38 17:40 2 min TBA Day 1
158 km
07
BARNALA
BNN 17:56 17:58 2 min TBA Day 1
177 km
08
DHURI JN
DUI 18:30 19:15 45 min TBA Day 1
208 km
09
MALERKOTLA
MET 19:32 19:34 2 min TBA Day 1
225 km
10
Ludhiana Jn
LDH 21:15 21:25 10 min TBA Day 1
270 km
11
JALANDHAR CANT
JRC 22:32 22:35 3 min TBA Day 1
322 km
12
DASUYA
DZA 23:20 23:22 2 min TBA Day 1
380 km
13
PATHANKOT CANTT
PTKC 00:23 00:28 5 min TBA Day 1
435 km
14
KATHUA
KTHU 00:56 00:58 2 min TBA Day 1
458 km
15
Jammu Tawi DESTINATION
JAT 02:35 02:35 — TBA Day 1
534 km
Traveler Experience

Onboard Amenities & Cabin Services (EXPRESS)

🍽️
Catering & Meals

Pantry car service with freshly cooked meals, packaged snacks, and authorized Rail Neer water service.

🔌
Power & Digital Convenience

230V AC universal charging socket + 5V USB port available at every individual seat. Digital passenger infotainment and station alert displays.

♿
Accessibility & Comfort

Ergonomic reclining seats (180° rotatable in Executive Class), wide level-boarding vestibules, braille seat numbering, and touchless vacuum bio-toilets.

🧳
Luggage & Safety

Aircraft-style modular overhead luggage racks, CCTV security surveillance throughout all coaches, and automatic fire detection with emergency talkback.

🏛️ Official Timetable Data sourced directly from published Indian Railways (CRIS / NTES) working documents.
✓ 100% Verified Schedule